Upgrade plan
The Butner Road Culvert at Johnson Creek is being upgraded through the County's Road Fund as part of the Annual Maintenance Plan.
- The six-foot, round culvert is in poor condition and being replaced as part of routine maintenance.
- A wooden pedestrian bridge is also being replaced.
Improvements include:
- Wider, nine-by-five-foot box culvert
- Longer culvert to accommodate bike lanes and sidewalks
- Potential improvements for the two-year to the 25-year flood mitigation
- Improved fish passage
Notes:
Don't:
- Use more than one hyperlink in the paragraph body, please
Do:
- Use headings to create a hierarchy (i.e. headings 2-6)
- Add spacing after a bullet or number list